Part of the WFCA common maintenance area are 8 storm sewer drainage ponds.  Of these ponds, 7 are wet retention ponds and 1 is a dry detention pond.  

​

Ponds #1 and #2 were dredged and re-lined.  In 2023 annual fees were increased to provide necessary funds.  In 2024 a loan was obtained to be repaid with the increase in fees for the restoration of  Ponds #3-#7 by dredging and installing new liners.  The project was completed in 2025.​​